Correct Answer
verified
Multiple Choice
A) 8.35%
B) 8.70%
C) 9.06%
D) 9.42%
Correct Answer
verified
Multiple Choice
A) If a firm has a beta that is less than 1.0, say 0.9, this would suggest that the expected returns on its assets are negatively correlated with the returns on most other firms' assets.
B) If a firm's managers want to maximize the value of the stock, they should, in theory, concentrate on project risk as measured by the standard deviation of the project's expected future cash flows.
C) If a firm evaluates all projects using the same cost of capital, and the CAPM is used to help determine that cost, then its risk as measured by beta will probably decline over time.
D) Project A has a standard deviation of expected returns of 20%, while Project B's standard deviation is only 10%. A's returns are negatively correlated with both the firm's other assets and the returns on most stocks in the economy, while B's returns are positively correlated. Therefore, Project A is less risky to a firm and should be evaluated with a lower cost of capital.
Correct Answer
verified